Articles like: Ashing Furnace AAF 11/3 1100°C, 3 litre 301 single ramp PID controller
The picture may be different from the article and can include supply, which is not in the standard scope.
| Art. No. | Description | Price | |
|---|---|---|---|
| 427111103 | Ashing Furnace AAF 11/3 1100°C, 3 litre 301 single ramp PID controller Ashing & Burnoff Chamber Furnace (220 - 240 V -SR-single phase + N) The picture shows an item from the same kind. Size and outfit could be different to that type. PID-Controller one ramp to setpoint 99 hour... | 3.820,00 Euro for 1 piece | |
| 427111107 | Ashing Furnace AAF 11/7 301 single ramp PID controller Ashing & Burnoff Chamber Furnace (380 - 415 V -SR-three phase + N) Uses 2 phases of a 3 phase and neutral power supply (extra cost option) The picture shows an item from the same kind. Size and outfit could be different to... | 5.390,00 Euro for 1 piece |



